Erosion Control Contractor Carrying TESC on Greater Seattle Sites

Mighty Arm Excavation, LLC is a licensed, bonded and insured erosion control contractor carrying TESC for Greater Seattle GCs and developers, with workmanship warranted one year from substantial completion. We install and maintain the BMPs on your TESC plan under your stormwater permit and SWPPP.

What We Install

Keeping Sediment on Site From Clearing to Final Stabilization

Temporary erosion and sediment control (TESC) is part of our earthwork services, and we carry it as its own line item whether it's bid alone or with site preparation. The work covers the BMPs that hold sediment on site, from perimeter controls and construction entrances to inlet protection, dewatering and cover on exposed soil. Our erosion control services run from the preconstruction plan review through maintenance, removal and final stabilization.

BMPs go in to the TESC plan, are maintained on the schedule the contract sets and are documented with photos for the GC's file. That is the standard we hold as an erosion control contractor, on standalone TESC bids and on sites where we also carry the dirt work.

checkmark

BMPs installed to the TESC plan and the SWPPP prepared for the site

checkmark

Photo documentation and records handed to the GC for their file

checkmark

CSI Division 31 scope: 31 25 00 Erosion and Sedimentation Controls

Leveled dirt pad and gravel entrance staged with silt fencing next to dense evergreen trees.Open dirt construction lot spread with light straw cover next to a parked black excavator and suburban homes.View looking down a straw-stabilized hillside past an orange silt fence toward work trucks parked near a house.
Our Scope

BMPs We Install and Maintain

Each card is a construction erosion control measure we self-perform, sized to the TESC plan and the site's disturbed area.

Orange silt fence and straw wattle erosion barriers installed along an urban residential site perimeter.

Silt Fencing

Silt fence installation with a slicer along perimeters and down-slope edges, repaired as needed through the maintenance term.

Track excavator spreading coarse aggregate stone for a heavy-duty construction entrance pad.

Temporary Construction Entrances

A stabilized construction entrance of quarry spalls at site access points, with rock refreshed as it loads up with sediment.

Straw mulch matting and silt fence perimeter installed for steep slope erosion control.

Straw Wattles

Wattles staked across slopes and along contours to slow runoff and catch sediment before it can leave the disturbed area.

Precast concrete catch basin riser, cast-iron grate, and storm sewer pipe staged next to a Yanmar mini excavator.

Inlet / Catch Basin Protection

Storm drain inlet protection on the catch basins and inlets the work affects, cleaned out and replaced as sediment builds up.

Ground contractor installing heavy-duty PVC storm pipe for site runoff conveyance.

Baker Tanks

Baker tank supply and setup to hold and settle sediment-laden water before it is filtered and discharged where authorized.

Muddy standing water pooling inside a dug-out footing trench lined with wood forms and lumber staging.

Dewatering

Construction dewatering with pump setup and monitoring, sediment bag filtration and coordinated discharge authorizations.

Why Mighty Arm

Self-Performed TESC Backed by Earthwork Experience

TESC goes on our bids as its own scope, priced apart from the excavation budget.

Track Record

550+

Projects delivered company-wide across Greater Seattle, private and public.

communication

Self-Performed Installation and Maintenance

Our own people install and maintain every BMP we bid, with no second sub in between.

water-pipe

Equipment and Materials on Hand

Silt fence slicer, baker tanks, pumps, filtration, sweeper, and wattles, fabric and spalls in stock.

inspection

Dedicated TESC Staffing

TESC runs with dedicated crew, backed by excavation crews cross-trained to support it.

infrastructure

One-Year Workmanship Warranty

Workmanship warranted one year from substantial completion, with stated exclusions.

How We Work

From Plan Review to Final Stabilization

The scope moves through plan review, installation, maintenance and closeout.

SEE OUR FULL PROCESS
Construction crew placing orange cones around an open street trench near a trench box and Hitachi excavator.

01

Plan Review and Site Walk

We review the TESC plan and SWPPP, walk the site to verify the BMP layout, flag conflicts between the plan and actual conditions, and coordinate the preconstruction meeting with the jurisdiction.

02

BMP Installation

Perimeter controls go in before any ground disturbance, along with the construction entrance and inlet protection on the affected structures.

03

Maintenance and BMP Checks

Scheduled and storm-event BMP checks drive repair and replacement, sediment removal, entrance rock refresh and street sweeping as needed.

04

Removal and Final Stabilization

Once the site is stabilized, we remove the BMPs, complete the final cleanup and hand the records to the GC.

Testimonials

Trusted by the GCs We Work For

The real test of a sub is whether a GC calls you for the next job. Here's what the contractors and developers we work with have to say.

5.0
starstarstarstarstar

From 220+ Google reviews

starstarstarstarstar
"Anton, Andy, and their team trenched and installed a new connection to our existing sewer so that we could plumb a bathroom in a new part of the house. They worked hard and showed a lot of care for their work by leaving our place really tidy despite needing to dig up half our front yard to complete the project! Would hire again, awesome work"
starstarstarstarstar
"I had an excellent experience working with Mighty Arm .They were incredibly responsive and supportive throughout my project.

They stayed on budget as promised and went above and beyond to help address some last-minute issues that came up."
starstarstarstarstar
"Anton did a fabulous job to take care of a big fallen tree in my yard. He carefully planned everything, always arrived on time, and took care of each step carefully. I will recommend him to my friends and neighbors."
starstarstarstarstar
"Anton did a superb job handling the fallen trees in our property after the cyclone this November. They were very professional and handled the job without disrupting the landscape. I will definitely recommend his team for any land clearing projects"
starstarstarstarstar
"I’ve known Anton for a while and can’t recommend his excavating business enough! Throughout my dealings with him, I’ve seen firsthand the level of care, professionalism, and expertise he brings to every project. Anton is reliable, dedicated, and truly knows his stuff when it comes to excavation. If you're looking for quality work and someone who takes pride in what they do, you’re in good hands with him. Highly recommend!"
starstarstarstarstar
"Anton is a professional with extensive experience in excavation services. I’ve witnessed him assisting numerous customers during the recent storm, and I’m delighted to hear positive feedback about his work. Well done!"
Where We Work

TESC Across Greater Seattle Jurisdictions

From offices in Bellevue, Seattle and Granite Falls, we carry TESC within a 50 to 70 mile radius of Seattle, from Tacoma to Bellingham and east to North Bend. Local TESC requirements vary by jurisdiction and sit alongside Ecology’s permit, and we work under those of Seattle (SDCI and SPU), King County, Bellevue, Snohomish County, Tacoma and the other jurisdictions across that range.

Seattle

Bellevue

Tacoma

Everett

Lynnwood

Bellingham

Granite Falls

North Bend

Excavator starting to dig for a manhole in a Seattle property
service city line
location
King County, WA

Home base & primary coverage

Sediment Control, Soil Cover and Street Protection

Beyond the six core BMPs, we install the measures that route and settle runoff, cover exposed soil and keep sediment off the street.

  • Runoff control: sediment traps and ponds, check dams, interceptor swales and berms, and compost sock.
  • Soil cover: plastic, an erosion control blanket or mulch on exposed soil and slopes, or hydroseeding or temporary seeding, as the TESC plan calls for.
  • Street protection: wheel wash at site exits and street sweeping as needed to control sediment tracked onto adjacent streets.
  • Concrete washout: containment for the concrete trades.
  • Stockpiles: stabilized against erosion.

Working Under the GC's Stormwater Permit and SWPPP

On our projects, the GC or owner holds the stormwater permit, and we work under it as the erosion control contractor.

  • Who needs coverage: Ecology's Construction Stormwater General Permit (CSWGP) covers sites that disturb one acre or more and discharge stormwater to surface waters of the state, and smaller sites in a larger common plan of development or sale that will. Confirm current rules with Ecology.
  • Plan implementation: we implement the stormwater pollution prevention plan prepared by the engineer or GC.
  • Plan coordination: we coordinate with the SWPPP preparer when the plan and the site need to be brought in line.

CESCL Coverage, Inspections and Corrective Action

We work under the GC's CESCL, the certified lead who conducts the site inspections the permit requires.

  • Inspection schedule: we check and maintain the BMPs on the same weekly and 24-hour post-discharge schedule the CESCL inspects to.
  • Corrective action: we complete the corrective work those inspections call for within the required timeframes.
  • Records: repairs are photographed, and the records go to the GC for their file.

Wet-Season Starts and Mass Grading in Winter

West of the Cascades, the wet season runs October 1 through April 30, and the permit cuts the time exposed soil can sit unworked from 7 days to 2.

  • January mass grading: we give our recommendations for the GC to consider and make sure the cost picture is clear before work starts.
  • Cost: a wet-season start increases project costs and can add TESC cost.
  • Soil: working through the wet season means more soil export and import.
  • Storm events: we monitor forecasts and pre-position ahead of a forecast storm, and mobilize on request when the GC calls for it.
  • Seattle steep slopes: grading or disturbing soil in a landslide-prone area from November 1 to March 31 needs an SDCI grading season extension, signed by the owner, contractor and geotechnical engineer.

Dewatering, Baker Tanks and Discharge Coordination

Our dewatering scope covers the tanks, pumps and filtration that handle sediment-laden water, plus the discharge coordination before it leaves the site.

  • Baker tanks: supply and setup.
  • Pumps: setup and monitoring.
  • Filtration: sediment bag filtration.
  • Discharge: discharge permitting and sanitary sewer discharge authorization, coordinated with the project team before water leaves the site.
  • Trench dewatering: part of the same scope, for underground utility trenches that run alongside the earthwork.

Ways to Award the TESC Scope

TESC can be bid as a standalone scope or bundled with our excavation services or site prep work.

  • Installation only, with the GC maintaining the BMPs
  • Installation plus ongoing maintenance for the project duration
  • Maintenance takeover on sites someone else installed
  • Emergency response when a site fails inspection
  • Outside our scope: long-term monitoring contracts and shoreline (SMA) jurisdiction work

Safety and Traffic Control on TESC Work

TESC work runs to the project safety plan, with added controls where it meets the street or a structure.

  • Traffic control on street-adjacent work
  • PPE and project safety plan compliance
  • Utility locates before driving posts or trenching
  • Confined space procedures for structure work on catch basins and inlets

How We Price TESC

As an erosion control contractor, we price TESC as its own line item rather than folding it into site prep, so your estimator can see it separately. We don't quote it as a percentage of the sitework contract, because that share varies too much from one site to the next.

How the line is built:

  • Installation: lump sum, or unit pricing per linear foot of silt fence, per inlet and per entrance
  • Maintenance: a monthly rate for the project duration
  • Storm response: time and materials
  • Baker tanks: baker tank rental passes through to the project
  • Removal: a separate line item

What drives the TESC number:

  • Disturbed acreage
  • Project duration, since maintenance is a time-based cost
  • Season of construction
  • Slope and soil type
  • Proximity to receiving waters or critical areas
  • Jurisdiction and inspection frequency
  • Dewatering requirements
  • Number of inlets and entrances

Payment terms:

  • Progress billing on Net 30 or Net 60 terms set in the contract
  • Prevailing wage with certified payroll on public jobs

The Sites We Carry TESC On

Our TESC work runs on private and public sites, including multi-acre sites that require CSWGP coverage. We've carried TESC on 4 acres of disturbed ground, and we can take on considerably larger sites.

  • Private commercial sites
  • Residential subdivisions and plats
  • Condo and townhome developments
  • Public works and federal projects
  • Sites in critical areas such as steep slopes and wetland buffers

Credentials for prequalifying us as your erosion control contractor:

  • Washington contractor license MIGHTAE766QK
  • UBI 605-632-469
  • SAM.gov registration
  • AGC membership
  • Bonded and insured
Frequently Asked Questions

Erosion Control Answers for GCs and Developers in Greater Seattle

Answers to what contractors and developers most often ask before bringing us onto a project.

How much does TESC cost on a sitework contract?

Plus Icon

Mighty Arm prices TESC per project as its own line item, and it doesn't publish a percentage benchmark because the share of a sitework contract varies too much from site to site. The price depends on disturbed acreage, project duration, season of construction, slope and soil type, proximity to receiving waters or critical areas, jurisdiction and inspection frequency, dewatering requirements, and the number of inlets and entrances.

Can you carry the whole TESC scope?

Plus Icon

Mighty Arm self-performs the BMPs it bids, from silt fencing, construction entrances and inlet protection to sediment traps, baker tanks, dewatering, wheel wash, street sweeping and concrete washout containment. It can install and maintain them for the project duration, as a standalone scope or bundled with its excavation and site prep work.

Can you start in the wet season?

Plus Icon

Mighty Arm takes on wet-season starts and gives the GC its recommendations before work begins. A start between October 1 and April 30 raises project costs, since wet-season work means more soil export and import and potentially more TESC cost.

Do you have a CESCL on staff?

Plus Icon

Mighty Arm works under the GC's CESCL, the certified lead that Ecology's construction stormwater permit requires for site inspections. It keeps the BMPs on the CESCL's weekly and post-discharge schedule, completes the corrective work those inspections call for, documents it with photos and hands the records to the GC.

Who holds the Construction Stormwater General Permit?

Plus Icon

On Mighty Arm's projects, the GC or owner holds the Construction Stormwater General Permit, and Mighty Arm works under it and implements the SWPPP the engineer or GC prepared. Coverage applies to sites disturbing one acre or more that discharge to surface waters, or smaller sites in a larger common plan of development or sale.

Can you take over TESC maintenance on a site someone else installed?

Plus Icon

Mighty Arm takes over maintenance on sites another contractor installed, and it responds when a site fails inspection. Maintenance runs for the project duration and is priced at a monthly rate, with storm response on time and materials.

How quickly can you mobilize for the initial TESC install?

Plus Icon

Mobilization for a Mighty Arm TESC install is set by the project schedule and the start lead times, so it varies from project to project. The timing is laid out in the proposal, and perimeter controls go in before any ground disturbance.

Is TESC work covered by your warranty?

Plus Icon

TESC workmanship carries Mighty Arm's one-year warranty from substantial completion, with manufacturer warranties on supplied materials passed through to the owner. The warranty covers the supply and installation Mighty Arm performs rather than BMP performance in a given storm, and it excludes damage caused by others, settlement beyond normal tolerances, misuse and changes in site use.

TALK TO US

Start Your Project With an Erosion Control Contractor

Tell us the project, the start date and who holds the permit. We'll come back with TESC priced out separately and the site assumptions behind it written into the proposal.

Tell Us About the Job

Give us the basics and a quick description of the scope. We'll take it from there.

Have site photos or plans? Upload them here (optional)
Max file size 10MB.
Uploading...
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
Max file size 10MB.
Uploading...
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
Max file size 10MB.
Uploading...
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.