Mighty Arm is handling mass grading, foundation over-excavation and underground utilities on a 27,000 SF Seattle site for a new 22-home Habitat community.


When Habitat for Humanity Seattle-King & Kittitas Counties set out to build a 22-home residential community on South Cloverdale Street in Seattle, the roughly 27,000 square foot site needed substantial work before a single foundation could go in. Geotechnical requirements called for around two feet of over-excavation beneath each foundation area, removal of unsuitable material, and replacement with structural fill over geogrid to create stable building pads. Alongside the soil improvement, the site needed extensive sewer, storm, water, and electrical utility infrastructure coordinated across the entire development to support all 22 homes.
Mighty Arm is handling the full scope of earthwork and civil sitework, including mass grading, foundation over-excavation, export of unsuitable soils, and installation of geogrid and structural fill, along with thousands of feet of underground sewer, storm, water and electrical utilities. On a dense 22-home site, careful sequencing is essential, so utility trenching is coordinated with the other trades to keep pace with home construction as it moves through each phase. The project is still underway, and the completed phases have already delivered the stable building pads, foundation preparation and utility infrastructure the development needs to keep moving forward.