Electrical Trenching and Power Structures Built to the Power Company's Design

Mighty Arm Excavation is a licensed, bonded and insured electrical trenching contractor for Greater Seattle GCs and electrical contractors, working within our underground utility scope. We dig, bed, backfill and restore to the power company's design, and the electrician and the power company handle the electrical work.

Request a Bid
WHAT WE INSTALL

What Our Electrical Trenching Covers

Mighty Arm Excavation digs the trench and sets the structures that carry power, then beds, backfills and restores them to the approved design. The electrical work itself stays with the electrician and the power company.

Our electrical trenching covers primary runs for the power company and secondary or building service runs. We excavate to depth and grade, place sand or select bedding, and backfill to the conduit layout on the approved plans. Where the design calls for it, we use CDF (controlled density fill, a flowable fill) in place of standard backfill.

Transformer pads and vaults, handholes and concrete-encased duct banks go in the same scope when the design calls for them. We trench, bed and backfill for PVC Schedule 40, PVC Schedule 80 and HDPE (high-density polyethylene) duct runs.

Conduit trenching sits inside our trench excavation work, with crews cross-trained with our earthwork crew. Each run is backfilled only after the required inspection.

checkmark

Built to the serving power company's design and construction standards

checkmark

Power company or inspector review before encasement or backfill

checkmark

CSI scope categories: 33 70 00 Electrical Utilities and 31 23 33 Trenching and Backfilling

Two excavators and a steel trench shoring box staged on a coned-off roadway for an underground utility projectFresh asphalt patch over a restored trench in a roadway, with traffic conesYellow Caterpillar excavator digging a deep street utility trench for underground electrical conduit installation beside orange traffic cones.
OUR SCOPE

Trenching and Structures for Power

Mighty Arm Excavation's electrical scope covers six kinds of trench and structure work, each sized to the power company's design and the project's electrical plans.

Trench excavated for electrical conduit on a Seattle site

Primary and Secondary Service Trenching

We trench for primary conduit, which carries the power company's line to the transformer. We also trench for secondary conduit, which carries service from the transformer to the building.

Pad-mounted transformer and service post on a cleared rural lot

Transformer Pads and Vaults

We excavate for transformer pads and vaults and set each structure to the design. Crane service for vault setting is brought in as needed.

Utility worker standing beside an excavated dirt pit and red Yanmar mini excavator with staged gray PVC electrical conduits by a chain-link fence.

Handholes and Pull Boxes

We set handholes, pull boxes and junction boxes to grade. A handhole is a small buried box that gives access to pull or splice cable.

Utility worker in high-visibility gear and hard hat shoveling crushed rock bedding inside a shored trench for underground electrical conduit installation.

Concrete-Encased Duct Banks

We trench for duct banks and place the concrete encasement. A duct bank is a group of conduits encased together in concrete to protect the cables inside.

Road closed sign, orange traffic cones, and barricades blocking a wooded street during underground electrical utility trenching with a red excavator.

Street and Site Lighting Conduit

We trench for street lighting conduit and pole bases in the right-of-way, and for site lighting conduit as part of site preparation on private sites.

Outdoor electric vehicle charging station mounted on a dark post with a plugged-in charging connector in a landscaped garden

EV Charger Conduit

We trench, bed and backfill EV charger conduit runs and restore the surface where a run crosses paving.

WHY MIGHTY ARM

Why GCs Bring Mighty Arm In on Power Trenching

Mighty Arm Excavation carries the trench from design review to restored surface. The work is built to the power company's standards and inspected before it is covered.

Track Record

556+

Projects delivered company-wide across Greater Seattle, private and public.

communication

Power Company Standards From the First Cut

We build to the power company's design and construction standards from the first cut, rather than correcting the work after an inspection.

water-pipe

Wet and Dry Utilities, One Contract

Sewer, storm and water can run under the same contract as the power trench, so one sub holds the trench and the backfill.

inspection

Inspection Before Backfill

We request power company inspections ahead and keep the trench open until the required inspection is complete.

infrastructure

One-Year Workmanship Warranty

Our workmanship is warranted for one year from substantial completion, with stated exclusions.

HOW WE WORK

From Power Company Design to Restored Surface

Electrical trenching runs in four stages: design review, trench and structures, inspection, then backfill and restoration.

SEE OUR FULL PROCESS
Street excavation and utility work scene with a tracked excavator, broken pavement, dump truck, orange traffic cones, and patched asphalt on a residential road
01

Design Review & Locates

We review the power company design and the electrical plans, then call 811 and pothole existing lines. Washington requires the 811 locate notice at least two full business days before excavation. Before digging, we put a trench safety plan in place, assign a competent person for trench safety and set clearances around existing energized lines. Traffic control is set up for right-of-way work.

02

Trench & Set

The trench goes to the depth and grade on the design, with bedding placed to the conduit layout. Vaults, pads and handholes are set, and duct banks are encased in concrete where required.

03

Inspection

The power company or its inspector reviews the trench before encasement or backfill. Snohomish County PUD, for example, must inspect and approve conduit installations before backfilling. We request inspections ahead and plan the work around inspector availability.

04

Backfill & Restoration

Backfill is placed and compacted in lifts, with warning tape above the run. Tracer wire, a locatable wire laid with the run, goes in where the design calls for it. We restore the surface, and when as-builts are in scope, the GC gets marked-up drawings of the locations and depths of our work. Some concrete or asphalt restoration and traffic control are subcontracted as needed.

TESTIMONIALS

What Our Clients Say

The real test of a sub is whether a GC calls you for the next job. Here's what the contractors and developers we work with have to say.

5.0
starstarstarstarstar

From 220+ Google reviews

starstarstarstarstar
"Anton, Andy, and their team trenched and installed a new connection to our existing sewer so that we could plumb a bathroom in a new part of the house. They worked hard and showed a lot of care for their work by leaving our place really tidy despite needing to dig up half our front yard to complete the project! Would hire again, awesome work"
starstarstarstarstar
"I had an excellent experience working with Mighty Arm .They were incredibly responsive and supportive throughout my project.

They stayed on budget as promised and went above and beyond to help address some last-minute issues that came up."
starstarstarstarstar
"Anton did a fabulous job to take care of a big fallen tree in my yard. He carefully planned everything, always arrived on time, and took care of each step carefully. I will recommend him to my friends and neighbors."
starstarstarstarstar
"Anton did a superb job handling the fallen trees in our property after the cyclone this November. They were very professional and handled the job without disrupting the landscape. I will definitely recommend his team for any land clearing projects"
starstarstarstarstar
"I’ve known Anton for a while and can’t recommend his excavating business enough! Throughout my dealings with him, I’ve seen firsthand the level of care, professionalism, and expertise he brings to every project. Anton is reliable, dedicated, and truly knows his stuff when it comes to excavation. If you're looking for quality work and someone who takes pride in what they do, you’re in good hands with him. Highly recommend!"
starstarstarstarstar
"Anton is a professional with extensive experience in excavation services. I’ve witnessed him assisting numerous customers during the recent storm, and I’m delighted to hear positive feedback about his work. Well done!"
WHERE WE WORK

Power Company Service Areas We Work In

Mighty Arm Excavation has trenched to the designs of Puget Sound Energy, Seattle City Light, Snohomish County PUD and Tacoma Power. From offices in Bellevue, Seattle and Granite Falls, we work from Tacoma north to Bellingham and east to North Bend, including Bellevue and Snohomish County.

The work runs from single-home service trenching to plats, condos and townhomes, private commercial sites, public works street lighting, federal projects and right-of-way work. Past projects with electrical trenching include a Monroe custom home site and a Seattle tiny house village.

Seattle

Tacoma

Everett

Lynnwood

Bellingham

North Bend

Excavator starting to dig for a manhole in a Seattle property
service city line
location
King County, WA

Home base & primary coverage

Where Does Our Scope End and the Electrician's Begin?

Mighty Arm Excavation's scope is the civil work: excavation, trenching, bedding, backfill, compaction, surface restoration and concrete encasement where required. Electricians pull wire and make connections, and the power company handles its own equipment and energization.

Party Typical scope
Mighty Arm Excavation Excavation, trenching, bedding, backfill and compaction; pad, vault and handhole excavation and setting; concrete encasement where required; surface restoration; as-builts when in scope
Electrician Pulling wire and making connections
Power company Design and standards, utility-owned equipment, inspection and energization

The exact split depends on the project and the utility, and the proposal states it before work starts.

Working to PSE, Seattle City Light, Snohomish PUD and Tacoma Power Standards

Mighty Arm Excavation builds electrical trench to the design and construction standards of the power company serving the site. Each utility publishes its own requirements, and they differ on details such as trench, bedding and inspection steps.

Seattle City Light, for example, keeps construction standards for customer trenching in the right-of-way and for primary conduit and duct bank installation. We review the power company design and the electrical plans against those standards before the first cut.

What Is a Joint Trench, and Can Gas Share It?

A joint trench is one trench that carries more than one utility, typically power, communications and gas. Gas can share it when the utilities' standards and the approved plans allow, and each trade installs its own line.

Tacoma Power, for example, publishes a residential joint utility trench standard.

On a joint trench, Mighty Arm excavates, beds and backfills at the required depths and separations. The layout and sequence are coordinated with the electrician and the utility providers on the approved plans. The energy company or its contractor installs the gas line, and backfill follows the required inspections.

Why Does Electrical Trench Get Rejected?

Common reasons are insufficient cover, wrong separation from other utilities and poor bedding. Trench is also rejected when the work doesn't match the approved plans or utility requirements, or when backfill goes in before inspection. PSE's red-tag list covers related problems, including trench not dug out, unacceptable conduit and no permit or inspection.

Those are the points to confirm before calling for inspection.

When a run conflicts with a wet utility or hits an unmarked line, we stop in that area and protect the existing line. We notify the GC and the utility, and change alignment or depth only after an approved fix.

What We Don't Do

Mighty Arm Excavation does the civil work for power, not the electrical work. Three things sit outside our scope:

  • Pulling wire or making terminations, which is electrician scope
  • Energized work
  • Directional boring

How Much Does Electrical Trenching Cost?

Mighty Arm prices electrical trenching per project from the power company design and the electrical plans, and doesn't publish rates. The number depends on the run and the structures in it.

How the work is priced:

  • Per linear foot of trench
  • Per vault, handhole or pad
  • Lump sum
  • Time and materials
  • A unit price schedule, so conditions found in the ground are priced fairly on agreed rates

What drives the number:

  • Trench length and depth
  • Number of conduits
  • Vaults, pads and handholes
  • Concrete encasement
  • Joint trench requirements
  • Right-of-way restoration

Payment terms:

  • Progress billing on Net 30 or Net 60 terms set in the contract
  • Prevailing wage with certified payroll on public jobs

Credentials for Prequalifying Mighty Arm

Mighty Arm Excavation is a Washington-licensed contractor, bonded and insured, with these details for prequalification:

  • Washington contractor license MIGHTAE766QK
  • UBI 605-632-469
  • SAM.gov registration for federal work
  • Set up for prevailing wage on public works
  • AGC membership
  • Bonded and insured
  • CSI scope categories 33 70 00, 33 71 00 and 31 23 33
FREQUENTLY ASKED QUESTIONS

Power Trenching Answers for GCs and Electrical Contractors

Answers to what GCs and electrical contractors most often ask before bringing us onto a power scope.

Can you build the joint trench?

Plus Icon

Mighty Arm excavates, beds and backfills joint trench for power, communications and gas at the depths and separations on the approved plans. Each trade installs its own utility, and the energy company or its contractor installs the gas line. Backfill follows the required inspections.

Do you work to PSE and Seattle City Light standards?

Plus Icon

Yes. Mighty Arm works to the design and construction standards of the power company serving the site. It has worked with Puget Sound Energy, Seattle City Light, Snohomish County PUD and Tacoma Power. On a City Light new service, the trench is built to City Light's published standards and inspection steps.

Do you set the transformer vault?

Plus Icon

Yes. Mighty Arm excavates for transformer pads and vaults and sets them to the power company's design, bringing in crane service for vault setting as needed. The power company handles its own equipment and energization.

How early should a GC bring you in on the power company design?

Plus Icon

Bring Mighty Arm in at project start. Power company designs can take a while depending on the jurisdiction, so early review lets the trench scope be priced and sequenced against the design.

Who digs the trench for a new PSE service?

Plus Icon

PSE makes the customer side responsible for having the trench ready. Its construction FAQ lists what must be ready, including trenches and work pits free of debris and water and debris-free sand backfill on hand. It also requires the proper size and type of conduit installed, and PSE red-tags a service when the trench isn't dug out. Mighty Arm can carry that trench for the GC or electrical contractor.

How much does electrical trenching cost per foot?

Plus Icon

Mighty Arm doesn't publish per-foot rates, because the price depends on the run. It prices per linear foot, per structure, lump sum, time and materials or on a unit price schedule. Trench length and depth, number of conduits, structures, encasement, joint trench requirements and right-of-way restoration all move the number.

How deep does an electrical service trench need to be?

Plus Icon

Depth is set by the serving power company's standard and the approved design, and it varies by utility and by primary or secondary service. Mighty Arm trenches to the depth and grade on the design, and cover is checked at inspection before backfill.

Can gas and electric go in the same trench?

Plus Icon

They can, in a joint trench built to the utilities' standards and the approved plans. Required separations come from those standards, and each trade installs its own line. Mighty Arm trenches, beds and backfills only.

TALK TO US

Start Your Electrical Trenching Project

Send the power company design, the electrical plans and your schedule. We'll come back with the trench and structures priced, and the assumptions and exclusions written into the proposal.

Tell Us About the Job

Give us the basics and a quick description of the scope. We'll take it from there.

Have site photos or plans? Upload them here (optional)
Max file size 10MB.
Uploading...
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
Max file size 10MB.
Uploading...
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
Max file size 10MB.
Uploading...
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.