Storm Drainage Contractor for GCs and Developers in Greater Seattle

Mighty Arm Excavation is a licensed, bonded and insured storm drainage contractor for GCs and developers across Greater Seattle. We install the conveyance, detention, infiltration and treatment on the civil plans as part of our underground utility scope.

Request a Bid
WHAT WE INSTALL

Conveyance, Flow Control and Treatment Built to Western Washington Manuals

Mighty Arm Excavation carries storm drain installation from the first catch basin to the outfall. The work is built to the manual and civil set your jurisdiction applies. The storm drainage system goes in to the rim and invert elevations on the drawings, so it drains and inspects as the engineer designed it.

Storm is one of the three wet systems we self-perform, alongside sewer and water. Excavation, grading, pipe, infiltration trenches, structure setting, rock and media placement, backfill and compaction stay with Mighty Arm. Crane services, landscape planting and some concrete or asphalt restoration are brought in as the job needs them.

checkmark

We build to the Ecology, King County and City of Seattle stormwater manuals, WSDOT/APWA specs and the project civil specs.

checkmark

As-builts of rims, inverts and structure locations go to the GC, from survey data the GC provides.

checkmark

The CSI scope is 33 40 00 Stormwater Utilities, 33 41 00 Storm Utility Drainage Piping and 33 49 00 Storm Drainage Structures.

Active site utility and backfilling progress with green drain pipes, concrete box, gravel base, chain-link fencing, excavator in the background, and worker on siteConcrete bioretention planter box installation on a commercial or multi-family site featuring internal white PVC drain pipes, gravel fill, and chain-link fencing under clear skies
Before
After
OUR SCOPE

Storm Drainage Systems We Install

Mighty Arm installs six groups of storm work to the civil plans, from conveyance through treatment.

Yanmar compact excavator parked beside a dug-up curb on a tree-lined residential street with orange safety delineators and a worker.

Storm Lines and Mains

We lay storm drains, storm lines and storm mains to laser line and grade. Pipe options include PVC, HDPE dual-wall, ductile iron, reinforced concrete and corrugated metal.

Two contractors preparing PVC storm pipe in a trench

Footing, Roof and Area Drains

We install footing drains, roof drain and downspout connections, trench drains and area drains. Curtain and French drains go in with perforated pipe.

Ductile iron pipe and a catch basin delivered on site

Catch Basins and Storm Structures

We handle catch basin installation for Type 1 and Type 2 structures, plus storm manholes, outfalls and flow control structures. A flow control structure, or control manhole, limits how fast detained water leaves the site.

Utility worker in an orange safety vest guiding a precast concrete catch basin lowered by an excavator into a residential street trench.

Detention Vaults and Systems

We build underground detention systems in pipe or chambers, set precast detention vaults, and cut retention and detention ponds to the flow control design.

Concrete bioretention planter box installation on a commercial or multi-family site featuring internal white PVC drain pipes, gravel fill, and chain-link fencing under clear skies

Infiltration, Bioretention and Permeable Pavement

We build low impact development (LID) facilities: infiltration trenches, drywells, rain gardens, bioretention planters that filter runoff through planted soil, and permeable pavement subgrade.

Site development stormwater drainage system featuring concrete inlet boxes and PVC piping laid on gravel bedding.

Treatment Structures

We set sand/oil separators, oil/water separators and cartridge storm filters to the treatment design, including CONTECH StormFilter structures.

WHY MIGHTY ARM

Why GCs Award Storm Drainage to Mighty Arm

With Mighty Arm, one subcontractor carries the whole storm system to sign-off. As a commercial drainage contractor, we back that with four commitments.

Track Record

556+

Projects delivered company-wide across Greater Seattle, private and public.

communication

Conveyance, Detention and Treatment Under One Sub

Pipe, structures, detention, infiltration and treatment run through one subcontractor, so the storm line, structures and vault aren't split between subs.

water-pipe

Infiltration Facilities Protected

Runoff, stockpiles and site traffic stay off infiltration areas until the soils around them are stabilized.

inspection

TESC and Storm by the Same Team

Our dedicated utility crew is cross-trained with the earthwork and TESC crews, so temporary and permanent drainage are sequenced together.

infrastructure

One-Year Workmanship Warranty

Workmanship is warranted one year from substantial completion, and manufacturer warranties pass through. If a test or inspection fails because of our installation, we redo the work at our cost.

HOW WE WORK

How Does a Storm Drainage Install Run?

A Mighty Arm storm install moves through preconstruction, installation, testing and inspection, then closeout.

SEE OUR FULL PROCESS
Two utility workers in hard hats and high-visibility vests installing a hydraulic aluminum trench shore inside a deep street excavation.
01

Preconstruction

We review the civil and drainage plans, confirm rim and invert elevations and connection points, and check infiltration assumptions with the geotech. Permits within our scope and 811 locates come before any digging.

02

Installation

Structures are set to grade and pipe is laid to laser line and grade, with drain rock, fabric and media placed to spec. Infiltration facilities stay protected from sediment as the work moves. Grades and elevations are checked throughout installation. Wrong slopes or structure elevations, poor bedding and sediment in infiltration systems are common storm defects we see on other sites.

03

Testing and Inspection

Lines get CCTV inspection, structures are flow tested, and PIT tests are coordinated with the geotech. A PIT test, or pilot infiltration test, measures how fast water soaks into native soil. The jurisdiction's inspector then walks the system for sign-off.

04

Closeout

Trenches are backfilled and compacted in lifts, and structures are cleaned before turnover. As-builts go to the GC.

TESTIMONIALS

What Our Clients Say

The real test of a sub is whether a GC calls you for the next job. Here's what the contractors and developers we work with have to say.

5.0
starstarstarstarstar

From 220+ Google reviews

starstarstarstarstar
"Anton, Andy, and their team trenched and installed a new connection to our existing sewer so that we could plumb a bathroom in a new part of the house. They worked hard and showed a lot of care for their work by leaving our place really tidy despite needing to dig up half our front yard to complete the project! Would hire again, awesome work"
starstarstarstarstar
"I had an excellent experience working with Mighty Arm .They were incredibly responsive and supportive throughout my project.

They stayed on budget as promised and went above and beyond to help address some last-minute issues that came up."
starstarstarstarstar
"Anton did a fabulous job to take care of a big fallen tree in my yard. He carefully planned everything, always arrived on time, and took care of each step carefully. I will recommend him to my friends and neighbors."
starstarstarstarstar
"Anton did a superb job handling the fallen trees in our property after the cyclone this November. They were very professional and handled the job without disrupting the landscape. I will definitely recommend his team for any land clearing projects"
starstarstarstarstar
"I’ve known Anton for a while and can’t recommend his excavating business enough! Throughout my dealings with him, I’ve seen firsthand the level of care, professionalism, and expertise he brings to every project. Anton is reliable, dedicated, and truly knows his stuff when it comes to excavation. If you're looking for quality work and someone who takes pride in what they do, you’re in good hands with him. Highly recommend!"
starstarstarstarstar
"Anton is a professional with extensive experience in excavation services. I’ve witnessed him assisting numerous customers during the recent storm, and I’m delighted to hear positive feedback about his work. Well done!"
WHERE WE WORK

Storm Drainage Across Greater Seattle Jurisdictions

Mighty Arm installs storm systems under Seattle (SPU and SDCI), King County, Bellevue, Snohomish County and Tacoma. As a stormwater contractor with offices in Bellevue, Seattle and Granite Falls, we cover the region from Tacoma to Bellingham and east to North Bend. Jurisdictions differ in the manual, standard plans and inspections they apply, and we build to the ones on your permit.

Seattle

Tacoma

Everett

Lynnwood

Bellingham

North Bend

Excavator starting to dig for a manhole in a Seattle property
service city line
location
King County, WA

Home base & primary coverage

Pipe, Structures and the Manuals We Build To

Mighty Arm builds to the stormwater manual your jurisdiction applies, with the pipe, structures and media the civil set specifies. Jurisdictions across Western Washington apply Ecology's 2024 Stormwater Management Manual for Western Washington or an equivalent local manual. King County uses its Surface Water Design Manual, now the 2026 edition. Seattle's Stormwater Code and Manual were updated effective July 1, 2026.

Item What Mighty Arm installs
Pipe PVC (SDR 35 and C900), HDPE dual-wall corrugated such as ADS N-12, ductile iron, reinforced concrete, corrugated metal
Drain pipe Perforated pipe for footing and infiltration drains
Structures Type 1 and Type 2 catch basins, storm manholes up to 54 inches, flow control structures, vaults, outfalls, precast treatment structures
Media Washed drain rock, bioretention soil mix and filter fabric, placed to spec
Standards WSDOT/APWA Standard Specifications, local standard plans and project civil specs

Our excavators set structures within their rated lifting capacity. When weight, reach or site conditions call for more, we bring in a crane and work to a lift plan. Precast catch basins, manholes and other structures come from project-approved suppliers. Bioretention soil mix is bought to the specified blend, and we place it.

Protecting Infiltration Facilities During Construction

Mighty Arm protects infiltration facilities from sediment from the day they are built until the site is stabilized. A trench, drywell, bioretention cell or permeable pavement section that loads with fines during construction may not infiltrate as designed.

  • Runoff: sediment-laden runoff is kept away with erosion and sediment controls.
  • Stockpiles and traffic: both stay off infiltration areas, with set access routes.
  • Sequencing: facilities are timed to limit exposure until surrounding soils are stabilized.
  • Finished facilities: these are protected from contamination and clogging through turnover.

In Seattle, bioretention in the public right-of-way that will become a City asset needs special inspection. The applicant selects and pays the special inspector. The contractor attends the SDOT preconstruction meeting and coordinates with the applicant when each inspection is due.

When Soils Don't Infiltrate as Designed

When native soils don't infiltrate the way the design assumed, Mighty Arm pauses the affected work and notifies the GC, civil engineer and geotech. We document the conditions in the excavation. Work on that facility resumes after more testing or an approved design revision. Design infiltration rates come from the geotech's testing, and field soils can differ.

Groundwater at Vaults and Detention Excavations

Mighty Arm handles groundwater at vault and detention excavations with dewatering pumps and sediment treatment as needed. Before the structure is set and backfilled, we coordinate with the project engineer on foundation stability, bedding and flotation. Flotation is the uplift a high water table puts on an empty vault or tank. The dig itself sits within our retention and detention excavation work.

Sequencing Storm With TESC and Grading

Mighty Arm sequences storm drainage with the TESC plan and site grading, so temporary and permanent drainage work together. Our TESC crews set erosion and sediment controls before clearing or earthwork starts.

  1. Storm is coordinated with rough grading and the other utilities.
  2. Installed structures are protected, and infiltration facilities are timed to limit sediment exposure.
  3. Final adjustments follow finish grade.
  4. Temporary controls stay until the site is stabilized.

Where storm crosses sewer or water, we pothole early to confirm locations and elevations. We follow the approved separation details, and any revised crossing is approved by the engineer and utility owner before it is installed.

How We Price Storm Drainage

Storm drain installation cost depends on the system on the plans. Mighty Arm prices each storm scope from the civil set rather than publishing ranges. The proposal states the scope, assumptions and exclusions behind the number.

How the price is built

  • Per linear foot of pipe
  • Per structure: catch basin, manhole, vault or treatment unit
  • Lump sum for a defined scope
  • Time and materials for unknown conditions
  • Material at cost plus markup
  • A unit price schedule, so added quantities and unknowns are priced fairly

What drives the storm number

  • Pipe size, material and length
  • Number and size of structures
  • Vault or detention system size
  • Depth and groundwater
  • Crane or heavy lift needs
  • Drain rock and media volume
  • Jurisdiction requirements
  • Season

What estimates tend to miss

GC estimates most often underestimate the work around the system: deep vault installs, shoring, groundwater, soil export, imported aggregate and restoration. Large precast structures can carry long lead times and need crane coordination. Utility conflicts, inspections and protecting infiltration facilities also affect cost and schedule.

Timelines and terms

For preliminary planning, a straightforward single-home drainage system may take several working days to a couple of weeks. A plat-wide system may take several weeks to several months, depending on size, depth, structures, site conditions and phasing. Material lead times, permits and inspections add to that. Commercial work is billed progressively on Net 30 or Net 60 terms, with prevailing wage and certified payroll on public jobs.

Storm Drainage Projects and Credentials

Mighty Arm's storm work runs from single-home drainage to plats, condo and townhome sites, private commercial, public works, federal and right-of-way projects.

  • Cloverdale 22-home site, Seattle: Mighty Arm installed more than 2,000 feet of storm, including the permeable pavement facilities.
  • Tacoma: Mighty Arm set a precast detention vault near Tacoma.
  • Kirkland storm relocation: a new catch basin and storm connection went in within 18 inches of a live gas line.

Credentials for prequalifying us

  • Washington contractor license MIGHTAE766QK
  • UBI 605-632-469
  • SAM.gov registration for federal work
  • Prevailing wage and certified payroll on public works
  • AGC membership
  • Bonded and insured

Safety on storm work

  • Trench safety plan and a competent person on site
  • Confined space entry for vaults and manholes
  • Lift plans for precast structures
  • Traffic control for right-of-way work
  • 811 locates and potholing before digging
FREQUENTLY ASKED QUESTIONS

Storm Drainage Questions From GCs and Estimators

Answers to what contractors and developers most often ask before bringing us onto a project.

Can you set the detention vault?

Plus Icon

Mighty Arm sets precast detention vaults with its excavators when the structure is within their rated lifting capacity. A crane comes in, working to a lift plan, when weight, reach or site conditions require it. Groundwater, bedding and flotation are coordinated with the engineer before the vault is set. Mighty Arm's experience setting large precast includes a detention vault near Tacoma.

Do you install the treatment units too?

Plus Icon

Mighty Arm installs sand/oil separators, oil/water separators and cartridge storm filters along with the rest of the storm system. Its experience includes CONTECH StormFilter structures, such as the 54-inch StormFilter manhole it set on a Sammamish site.

Can you build the permeable pavement section?

Plus Icon

Mighty Arm builds the subgrade and storage layer of permeable pavement facilities to the civil specs, as on its Cloverdale site in Seattle. Sediment-laden runoff, stockpiles and traffic stay off the section until the surrounding soils are stabilized. Responsibility for the pervious surface course is set out in each proposal.

How do you keep sediment out of the system during construction?

Plus Icon

Mighty Arm installs TESC before clearing or earthwork. It then keeps sediment-laden runoff, stockpiles and construction traffic away from storm and infiltration facilities with erosion controls and designated access routes. Infiltration facilities are timed to limit exposure until soils are stabilized, and structures are cleaned before turnover.

Can you do sewer, storm and water under one contract?

Plus Icon

Mighty Arm self-performs sanitary sewer, storm drainage and water as one underground utility scope, and can carry the earthwork alongside them. One subcontractor then holds grade, bedding and compaction across all three systems.

How long does a single-home drainage system take compared with a plat-wide system?

Plus Icon

For preliminary planning, Mighty Arm estimates several working days to a couple of weeks for a straightforward single-home drainage system. A plat-wide system may take several weeks to several months, depending on system size, depth, structures, site conditions and phasing. Material lead times, permits and inspections add to that.

TALK TO US

Start Your Project With a Storm Drainage Contractor

Send the civil set, the drainage report and your schedule. We'll come back with the storm scope priced and the site assumptions written into the proposal.

Tell Us About the Job

Give us the basics and a quick description of the scope. We'll take it from there.

Have site photos or plans? Upload them here (optional)
Max file size 10MB.
Uploading...
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
Max file size 10MB.
Uploading...
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
Max file size 10MB.
Uploading...
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.